ru | eng

References

2020 2019 2018  2017 2016

2020

Client: AO "ILIM Group"

Work period: December, 2019 — August, 2022

Project: Development of Detailed Design for the "Construction of the inter-shop communications" under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project"


Read more

Client: AO "Rusatom Infrastructure Solutions" (former AO "OTEK")

Work period: June, 2020 — January, 2022

Project: Refurbishment of CHP plant in the Seversk branch of AO "OTEK"


Read more

Client: AO "ILIM Group"

Work period: July, 2019 — January, 2022

Project: Technical refurbishment of existing bark boilers Nos. 4 and 5 KM 75-40 with the conversion of burning bark and wood wastes to the fluidized bed technology with a new dust removal system


Read more

Client: AO "ILIM Group"

Work period: November, 2019 — December, 2021

Project: Construction of RB-4 under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project


Read more

Client: AO "ILIM Group"

Work period: June, 2019 — December, 2020

Project: Technical refurbishment of recovery boiler No. 5 (RB-5) for the Koryazhma branch of AO "Ilim Group"


Read more

Client: ZAO "PIRS"

Work period: October, 2019 — September, 2020

Project: Construction of a steam-ejector plant for the needs of Omsk Oil Refinery


Read more

Client: PAO "Irkutskenergo"

Work period: April, 2020 – August, 2020

Project: Engineering surveys, development of design and detailed design documentation on re-equipment of the flue stack No.1 of Novo-Irkutskaya CHP plant with installation of the continuous automatic pollutants emission monitoring and pollutants volume and/or weight and concentration accounting systems (CAPEMA)"


Read more

Client: AO "ILIM Group"

Work period: November, 2019 — June, 2020

Project: Development of detailed design under the "System for collection and disposal of DNCG gases from evaporator plants Nos. 6, 7 and 8, burning in RB-11, retrofitting" investment project


Read more

Client: AO "Valmet Automation"

Work period: September 2019 — April 2020

Project: Commissioning of the biofuel boiler Hybex ® at AO "Mondi SLPK"


Read more

2019

Client: AO "TGK-11"

Work period: April 2019 — December 2019

Project: Examination of the support and suspension system and verification of calculations for the steampipes at Omskaya СHP-3


Read more

Client: PAO "Irkutskenergo"

Work period: May 2019 — August 2019

Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6 and Angarskaya CHP-10


View feedback on Angarskaya CHP-10
View feedback on Bratskaya CHP-6
Read more

Client: OOO "TOR"

Work period: June 2019 — July 2019

Project: Development of metal structure drawings for the Ilim Group Branch in Ust-Ilimsk


Read more

Client: PAO "OGK-2"

Work period: August 2018 — June 2019

Project: Development of technology and equipment for black oil-free ignition of BKZ-420-140 at Krasnoyarskaya GRES-2


Read more

Client: PREMAR SERVICES A.G.

Work period: May 2019 — June 2019

Project: Examination of energy facilities of AO "Galenika" (Serbia) with the development of recommendations for its refurbishment


Read more

Client: AO "Ilim Group"

Work period: April 2019 — June 2019

Project: Development of documents for FEL3, working and design documents for the recovery boiler (RB-3000) of TPP-3 at the Bratsk Pulp and Paper Mill


Read more

Client: OOO "Service Metal Center Steelline"

Work period: May 2019 — June 2019

Project: Development of detailed design for the refurbishment of PAO "Tyazhstankogidropress"


Read more

Client: AO "Ilim Group"

Work period: November 2018 — June 2019

Project: Development of FEL-2 documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma


View feedback
Read more

Client:AO "OTEK"

Work period: January 2019 — May 2019

Project: Elaboration of an engineering solution and development of financial feasibility study for the construction of CHP Plant of AO "OTEK’s" Seversk Branch


View feedback
Read more

Client: Sky Topeco D.O.O. Beograd

Work period: February 2019 — April 2019

Project: Heat tests for the boiler at the Ugljevik TPP (Bosnia and Herzegovina, Republika Srpska)


Read more

Client: OOO RK "Energostroy"

Work period: March 2019 — April 2019

Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions


Read more

Client: OOO "Mechel-Energo"

Work period: February 2019 — April 2019

Project: Development of a feasibility study for the retrofitting of the chemical water treatment system in the CHP Plant of a Moscow Coke and Gas Plant


Read more

Client: OOO "Siberian Heat and Power Company" (SibTEK

Work period: November 2018 — January 2019

Project:Design and survey works, and installation of a semi-automatic boiler ignition system in the Linyovo heat supply boiler house, Novosibirsk Region


Read more

Client: PAO TGK-14 (Chitinskaya Generatsiya)

Work period: November 2018 — January 2019

Project: Examination of the hydraulic ash-transport system at Chitinskaya CHP-1


View feedback
Read more

2018 

2017

2016

[contact-form-7 id=»76″ title=»Заказать звонок из шапки»]

×

[contact-form-7 id=»449″ title=»Отправить заявку из шапки»]

×

[contact-form-7 id=»849″ title=»Заявка со страницы Студентам»]

×
×

[contact-form-7 id=»3017″ title=»Отправить заявку с главной_english»]

×

[contact-form-7 id=»3114″ title=»Задать вопрос — безмазутный розжиг»]

×

[contact-form-7 id=»3115″ title=»Задать вопрос — Системы контроля выбросов»]

×

[contact-form-7 id=»3116″ title=»Задать вопрос — система контроля стоков»]

×

[contact-form-7 id=»3117″ title=»Задать вопрос — Реконструкция содорегенерационных котлов»]

×

[contact-form-7 id=»3118″ title=»Задать вопрос — Котлы с кольцевой топкой»]

×

[contact-form-7 id=»3119″ title=»Задать вопрос — Котлы с форсированным кипящим слоем»]

×

[contact-form-7 id=»3120″ title=»Задать вопрос — Очистка поверхностей нагрева котлов»]

×

[contact-form-7 id=»3121″ title=»Задать вопрос — Частотно-регулируемый привод»]

×

[contact-form-7 id=»3122″ title=»Задать вопрос — Комплексная утилизация золошлаковых отходов»]

×

[contact-form-7 id=»3123″ title=»Задать вопрос — Поставка запальников и датчиков контроля факела»]

×

[contact-form-7 id=»3125″ title=»Вопрос: Black oil-free ignition of pulverized coal boilers»]

×

[contact-form-7 id=»3131″ title=»Вопрос: Industrial emission control systems»]

×

[contact-form-7 id=»3132″ title=»Вопрос: Discharge control systems»]

×

[contact-form-7 id=»3133″ title=»Вопрос: Cleaning of boiler heating surfaces»]

×

[contact-form-7 id=»3134″ title=»Вопрос: Retrofit of soda recovery boilers»]

×

[contact-form-7 id=»3135″ title=»Вопрос: Circular furnace boilers»]

×

[contact-form-7 id=»3136″ title=»Вопрос: Boilers with a fast fluidized-bed»]

×

[contact-form-7 id=»3137″ title=»Вопрос: Variable frequency drive»]

×

[contact-form-7 id=»3138″ title=»Вопрос: Comprehensive handling of bottom ash wast»]

×

[contact-form-7 id=»3138″ title=»Вопрос: Comprehensive handling of bottom ash wast»]

×

[contact-form-7 id=»4378″ title=»Задать вопрос докладчику»]

×
Наверх