Client: AO "ILIM Group"
Work period: December, 2019 — August, 2022
Project: Development of Detailed Design for the "Construction of the inter-shop communications" under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project"
Client: AO "Rusatom Infrastructure Solutions" (former AO "OTEK")
Work period: June, 2020 — January, 2022
Project: Refurbishment of CHP plant in the Seversk branch of AO "OTEK"
Client: AO "ILIM Group"
Work period: July, 2019 — January, 2022
Project: Technical refurbishment of existing bark boilers Nos. 4 and 5 KM 75-40 with the conversion of burning bark and wood wastes to the fluidized bed technology with a new dust removal system
Client: AO "ILIM Group"
Work period: November, 2019 — December, 2021
Project: Construction of RB-4 under the "Construction of Pulp and Cardboard Mill in Ust-Ilimsk" Project
Client: AO "ILIM Group"
Work period: June, 2019 — December, 2020
Project: Technical refurbishment of recovery boiler No. 5 (RB-5) for the Koryazhma branch of AO "Ilim Group"
Client: ZAO "PIRS"
Work period: October, 2019 — September, 2020
Project: Construction of a steam-ejector plant for the needs of Omsk Oil Refinery
Client: PAO "Irkutskenergo"
Work period: April, 2020 – August, 2020
Project: Engineering surveys, development of design and detailed design documentation on re-equipment of the flue stack No.1 of Novo-Irkutskaya CHP plant with installation of the continuous automatic pollutants emission monitoring and pollutants volume and/or weight and concentration accounting systems (CAPEMA)"
Client: AO "ILIM Group"
Work period: November, 2019 — June, 2020
Project: Development of detailed design under the "System for collection and disposal of DNCG gases from evaporator plants Nos. 6, 7 and 8, burning in RB-11, retrofitting" investment project
Client: AO "Valmet Automation"
Work period: September 2019 — April 2020
Project: Commissioning of the biofuel boiler Hybex ® at AO "Mondi SLPK"
Read more
Client: AO "TGK-11"
Work period: April 2019 — December 2019
Project: Examination of the support and suspension system and verification of calculations for the steampipes at Omskaya СHP-3
Client: PAO "Irkutskenergo"
Work period: May 2019 — August 2019
Project: Testing the measuring equipment to determine the possibility of installing the continuous emission control system for coal ash (dust) with flue gases at Bratskaya CHP-6 and Angarskaya CHP-10
View feedback on Angarskaya CHP-10 View feedback on Bratskaya CHP-6 Read moreClient: OOO "TOR"
Work period: June 2019 — July 2019
Project: Development of metal structure drawings for the Ilim Group Branch in Ust-Ilimsk
Client: PAO "OGK-2"
Work period: August 2018 — June 2019
Project: Development of technology and equipment for black oil-free ignition of BKZ-420-140 at Krasnoyarskaya GRES-2
Client: PREMAR SERVICES A.G.
Work period: May 2019 — June 2019
Project: Examination of energy facilities of AO "Galenika" (Serbia) with the development of recommendations for its refurbishment
Read moreClient: AO "Ilim Group"
Work period: April 2019 — June 2019
Project: Development of documents for FEL3, working and design documents for the recovery boiler (RB-3000) of TPP-3 at the Bratsk Pulp and Paper Mill
Client: OOO "Service Metal Center Steelline"
Work period: May 2019 — June 2019
Project: Development of detailed design for the refurbishment of PAO "Tyazhstankogidropress"
Client: AO "Ilim Group"
Work period: November 2018 — June 2019
Project: Development of FEL-2 documentation under the scope of the investment project for the RB No.5 retrofit at Koryazhma
Client:AO "OTEK"
Work period: January 2019 — May 2019
Project: Elaboration of an engineering solution and development of financial feasibility study for the construction of CHP Plant of AO "OTEK’s" Seversk Branch
Client: Sky Topeco D.O.O. Beograd
Work period: February 2019 — April 2019
Project: Heat tests for the boiler at the Ugljevik TPP (Bosnia and Herzegovina, Republika Srpska)
Client: OOO RK "Energostroy"
Work period: March 2019 — April 2019
Project: Development of a feasibility study for the production of the main power-generating equipment for power units with the installed power capacity 200–230 and 300–350 MW at the sites of the Astrakhan and Kaluga regions
Client: OOO "Mechel-Energo"
Work period: February 2019 — April 2019
Project: Development of a feasibility study for the retrofitting of the chemical water treatment system in the CHP Plant of a Moscow Coke and Gas Plant
Client: OOO "Siberian Heat and Power Company" (SibTEK
Work period: November 2018 — January 2019
Project:Design and survey works, and installation of a semi-automatic boiler ignition system in the Linyovo heat supply boiler house, Novosibirsk Region
Client: PAO TGK-14 (Chitinskaya Generatsiya)
Work period: November 2018 — January 2019
Project: Examination of the hydraulic ash-transport system at Chitinskaya CHP-1
PROJECTS
PRESS CENTER
2019 © ООО "COTES Engineering"
[contact-form-7 id=»76″ title=»Заказать звонок из шапки»]
[contact-form-7 id=»449″ title=»Отправить заявку из шапки»]
[contact-form-7 id=»849″ title=»Заявка со страницы Студентам»]
[contact-form-7 id=»3017″ title=»Отправить заявку с главной_english»]
[contact-form-7 id=»3114″ title=»Задать вопрос — безмазутный розжиг»]
[contact-form-7 id=»3115″ title=»Задать вопрос — Системы контроля выбросов»]
[contact-form-7 id=»3116″ title=»Задать вопрос — система контроля стоков»]
[contact-form-7 id=»3117″ title=»Задать вопрос — Реконструкция содорегенерационных котлов»]
[contact-form-7 id=»3118″ title=»Задать вопрос — Котлы с кольцевой топкой»]
[contact-form-7 id=»3119″ title=»Задать вопрос — Котлы с форсированным кипящим слоем»]
[contact-form-7 id=»3120″ title=»Задать вопрос — Очистка поверхностей нагрева котлов»]
[contact-form-7 id=»3121″ title=»Задать вопрос — Частотно-регулируемый привод»]
[contact-form-7 id=»3122″ title=»Задать вопрос — Комплексная утилизация золошлаковых отходов»]
[contact-form-7 id=»3123″ title=»Задать вопрос — Поставка запальников и датчиков контроля факела»]
[contact-form-7 id=»3125″ title=»Вопрос: Black oil-free ignition of pulverized coal boilers»]
[contact-form-7 id=»3131″ title=»Вопрос: Industrial emission control systems»]
[contact-form-7 id=»3132″ title=»Вопрос: Discharge control systems»]
[contact-form-7 id=»3133″ title=»Вопрос: Cleaning of boiler heating surfaces»]
[contact-form-7 id=»3134″ title=»Вопрос: Retrofit of soda recovery boilers»]
[contact-form-7 id=»3135″ title=»Вопрос: Circular furnace boilers»]
[contact-form-7 id=»3136″ title=»Вопрос: Boilers with a fast fluidized-bed»]
[contact-form-7 id=»3137″ title=»Вопрос: Variable frequency drive»]
[contact-form-7 id=»3138″ title=»Вопрос: Comprehensive handling of bottom ash wast»]
[contact-form-7 id=»3138″ title=»Вопрос: Comprehensive handling of bottom ash wast»]
[contact-form-7 id=»4378″ title=»Задать вопрос докладчику»]